Demos & videos

Demos & videos

Short walkthroughs of how we work. Every product screen is a mock-up with a fictional company; no real customers and no invented results.

From demo to production: the explainer

One change through an agentic SDLC, test intelligence and an AIOps closed loop. Oracle Fusion example.

5:00 minEnglish, captions burned in

Agentic QA factory for Cognigy: a pre-merge gate inside FAT → PAT

A ticket flow passes its own tests but breaks main-flow routing. A pre-merge gate catches it: an impact graph, three test suites on a temporary candidate main flow, parallel reviewers and a Merge Gate. Your FAT and PAT stay as they are.

4:59 minEnglish, captions burned in

The gate inside your FAT → PAT

Diagram: agentic QA factory for Cognigy. Jira ticket to Codex Engineer; A, ticket-flow tests in FAT; B, the new pre-merge gate with Change Analyst, Test Planner and Impact Analyst, an impact graph, a temporary isolated candidate main flow running ticket-flow tests, main-flow baseline regression and candidate integration regression, parallel business, QA, security and platform reviewers, and a Merge Gate (fail: defects to Jira, ticket flow unmerged; pass: an engineer or policy authorizes the merge); C, merge into the FAT main flow plus a smoke test; D, PAT unchanged.
Built on standard Cognigy (API, packages, snapshots, Playbooks, Simulator) and the Cognigy plugin for Codex, plus the orchestrator, agents, suites and gate we build with your team. Flow changes go through the API, the plugin or packages, because the CLI’s flow push does not change flow structure.

How to build it: 7 steps

  1. Capture a reliable baseline and automate the existing ticket-flow tests.
  2. Build the main-flow journey catalogue and establish baseline regression results.
  3. Implement dependency-aware impact analysis from Cognigy resources and flow connections.
  4. Create the temporary candidate integration workflow, provided it can be isolated safely in FAT.
  5. Add risk-based reviews and a hard pre-merge gate.
  6. Integrate Jira comments and evidence links.
  7. Preserve the current post-merge FAT and PAT release procedures.

Want this on your stack?

We show it on a setup like yours in a 15-minute call.